Skip to content
Engineer reviewing an architecture diagram at a desk, with a server hall behind glass

Services

14 services. One accountable team.

New product lines, data and AI platforms, cloud infrastructure and connected hardware — built by one team, and run after launch if you want. Engage us for one piece or the whole system; every engagement starts with a written, fixed-fee plan.

At a glance

Services compared

Timelines are typical ranges; your plan is fixed after scoping.

Service What you get Engagement Typical timeline
New product line platforms The full platform for a new division: portals, commerce, billing, integrations. Discovery sprint, then a phased build to launch First release typically 8–16 weeks
Data & AI platforms Data pipelines, labeling workflows and project tooling that feed AI models. Pipeline sprint or full platform build Pipeline sprint: 2–4 weeks · Platform: 3–6 months
Performance & legacy modernization Profile, fix, and incrementally rewrite systems that can’t keep up. Performance audit, then fixed-scope phases Audit: 1–2 weeks · Phases: 4–12 weeks each
Database migration Oracle and SQL Server to PostgreSQL or MySQL — off the license bill. Assessment, then a phased migration per database Sized after the assessment
Fractional CTO & engineering Technical leadership, roadmap, hiring and vendor decisions. Monthly retainer, a set number of days per month Typically 3–12 months
IoT product engineering Firmware, device-to-cloud, command & control, OTA, fleet consoles. Scoping sprint, then a fixed-scope build to a fielded pilot Typical pilot-to-production build: 8–16 weeks
Cellular & satellite connectivity LTE-M, NB-IoT, eSIM, satellite NTN, private LTE, failover paths. Connectivity assessment, then integration inside a product build Assessment: 1–2 weeks · Integration: 4–10 weeks
Edge AI & computer vision On-device inference, detection & tracking, anomaly detection. Feasibility spike on your data, then a production build Feasibility: 2–4 weeks · Production: 6–12 weeks
Hardware design & manufacturing Prototype to production: electronics, enclosures, test and build. Design review, then prototype and pilot-run builds Varies by design maturity — scoped after review
Cloud infrastructure & IaC AWS, Google Cloud and Azure — designed, codified in Terraform, and supported. Foundation build, then optional monthly IaC support Foundation: 3–6 weeks · Support: month to month
Cloud cost reduction Read-only diagnostic, then a fixed-fee plan to capture the savings. Diagnostic, then optional fixed-fee execution Diagnostic: ~10 days · Execution: 4–8 weeks
Mainframe & IBM i migration Move COBOL and RPG workloads off the IBM box. Paid from the savings. Diagnostic, then migration in waves, one job at a time Sized to your job list after the diagnostic
Infrastructure evaluation Architecture, security, scalability and cost — assessed and ranked. Fixed-fee assessment Typically 2–3 weeks
DevOps, SRE & ongoing support CI/CD, infrastructure as code, observability, on-call and SLOs. Setup project, then a monthly support retainer Setup: 3–8 weeks · Support: month to month